M6 Mixer Chamber DN2200 Pipework at Frankley WTW

Installation continues of the DN2200 FBE coated carbon steel pipework within the M6 Mixer Chamber at Frankley WTW.

Franklyn Yates were commissioned to design, supply, manufacture and install the complete pipework system within the M6 Mixer Chamber. This included the installation of the pipework support systems and the free issue DN1800 butterfly valves and the DN1800 static mixers.